Leave a Message

Thank you for your message. We will be in touch with you shortly.

Explore Our Properties

Clearwater Condo Reserves and Inspections: Buyer’s Guide

December 18, 2025

Buying a Clearwater condo is exciting, but the real story is not just the view or finishes. It is how well the building is cared for and funded. If reserves are thin or inspections reveal issues, you could face surprise assessments, lender hurdles, or delays. This guide helps you read the right documents, spot red flags, and protect your purchase in Pinellas County. Let’s dive in.

Why this matters in Clearwater

Clearwater’s Gulf exposure means salt air, humidity, and storms work harder on buildings than they do inland. Older reinforced concrete can corrode and spall if waterproofing fails. Roofs, balconies, and waterproofing systems often need service on shorter cycles here.

Many coastal condos were built between the 1960s and 1990s. Age plus coastal conditions raise the stakes for structural maintenance. When reserves are underfunded or inspections find problems, associations may levy special assessments or take on debt. Lenders and insurers can also tighten requirements, which can affect your financing and resale.

Florida rules in plain English

Florida’s Condominium Act, Chapter 718, governs budgets, reserves, disclosures to buyers, and association maintenance and insurance obligations. Associations commonly use professional reserve studies to plan for big replacements. Some communities can vote to reduce or waive funding for certain reserves. If reserves have been waived, that is a major flag to investigate.

After the Surfside collapse in 2021, Florida enacted milestone inspection requirements aimed at identifying structural concerns as buildings age. The details depend on factors like building age, height, and coastal proximity, and they continue to evolve. Engineering reports are performed by licensed structural engineers or architects and highlight any needed repairs and safety priorities. Verify current requirements with Florida’s DBPR and check Pinellas County and City of Clearwater guidance for local components or records.

Request these documents early

Ask for these within your inspection period so you have time to review and respond:

  • Governing documents: Declaration of Condominium, Articles, Bylaws, amendments, and rules.
  • Budgets and financials: current budget, last 2–3 years of budgets, year-to-date financial statements, and any audited or reviewed financial statements.
  • Reserves: the most recent reserve study, the reserve funding schedule, actual reserve balances, and if available, bank statements or a CPA letter verifying balances.
  • Debt and assessments: details on association loans, history of special assessments, and any planned assessments.
  • Inspections and engineering: milestone inspection reports, Structural Integrity Reserve Studies (SIRS) or similar engineering reports, repair specifications, bids, contracts, and permit records for major work.
  • Insurance and claims: certificates and policies for property, liability, directors and officers, and fidelity coverage, plus claims history for 5–10 years and any pending claims.
  • Meetings and communications: board and annual meeting minutes from the last 12–24 months, especially where funding, inspections, or repair projects were discussed; any member votes on reserves or projects.
  • Litigation: any active cases or arbitration.
  • Estoppel and lender questionnaires: estoppel with fee and assessment status, plus recent lender questionnaires if mortgage approvals have been an issue.

Read the numbers like a pro

Focus on four reserve and finance indicators:

  • Funding ratio: Compare actual reserve cash to the reserve study’s recommended balance for the same date. A low ratio can mean a higher risk of special assessments.
  • Annual reserve contributions: Look at reserve contributions as a percentage of the total budget. Very low or zero contributions, especially without a recent member vote to waive, are a concern.
  • Remaining useful life: Reserve studies list components with useful life and remaining life. Items due in the next 2–5 years, like roofs or balconies, need to be matched with adequate funding.
  • Assessments and loans: A pattern of large or repeated assessments, or a big loan combined with low reserves, reduces flexibility and can point to deferred maintenance.

Milestone inspections and SIRS

Structural reports often go by names like milestone inspection, structural engineering report, or SIRS. They are performed by licensed professionals and typically include:

  • Scope and limitations: what areas were observed and any exclusions.
  • Visual observations: structure, concrete, steel reinforcement, exterior envelope, balconies, waterproofing, and egress.
  • Condition ratings and recommendations: what is urgent, what is near term, and what can wait.
  • Timeline and costs: suggested schedule and opinion of probable cost. These often inform reserve updates.
  • Next steps: whether invasive testing is needed for full diagnosis.

Classify urgency the way engineers do. Immediate issues may require emergency measures. Short-term items should be addressed within 1–3 years to avoid escalation. Long-term items belong in the reserve plan.

Red flags to watch

If you see any of the following, pause and ask follow-up questions:

  • Immediate safety concerns without a firm, funded repair plan.
  • Statements like “further invasive testing required” with no budget or timeline.
  • Extensive corrosion, spalling in structural members, or cracks in load-bearing elements.
  • Ongoing water intrusion at balconies, windows, or roofs without a long-term solution.
  • Repeated patching of concrete with no structural rehabilitation plan.
  • A big gap between the engineer’s cost estimates and the association’s reserves or budget.
  • Findings that could affect insurance renewals or coverage limits.

Due diligence timeline

  • Early request: Right after you are under contract, request governing documents, the current budget, reserve study, engineering reports, certificates of insurance, minutes from the last 12 months, and an estoppel if available.
  • Within the inspection period: Review documents with your agent and, if needed, a condo-focused attorney. If structural or financial red flags appear, hire a licensed structural engineer to review the reports or perform a targeted inspection.
  • Clarify with the association: Ask written questions about reserves, upcoming projects, funding plans, and insurance conditions. Request bids, contracts, and permits for any critical work.
  • Pre-closing: Confirm that promised repairs are permitted and contracted, that assessments or loans to fund them have been approved, and that insurance renewals are in place.

Smart questions to ask the association

Financial and reserves

  1. What is the current reserve cash balance, and can you provide bank statements or CPA verification?

  2. May I see the most recent reserve study with remaining useful life for major components?

  3. Has the board ever voted to waive or reduce reserve funding? Please provide minutes and vote results.

  4. Are there any outstanding association loans or lines of credit? Share the principal balance, maturity, and key terms.

  5. Any special assessments planned or recently levied? Provide member notices and minutes.

Inspections and structural issues

  1. Has the building had a milestone or structural inspection in the last 5 years? Please provide complete reports and follow-up correspondence.

  2. Were any immediate safety concerns identified? What actions were taken and when? Provide bids and permits.

  3. What major structural repairs have been completed in the past 5 years? Share contracts, change orders, permits, and final inspections.

  4. Are there items that still require invasive testing or further engineering?

Insurance, claims, and litigation

  1. Provide certificates of insurance and note any key sublimits, hurricane deductibles, or exclusions that could affect owner costs.

  2. Are there pending claims or litigation that could result in a material assessment? Share case details and status.

Governance and operations

  1. Provide board minutes for the past 12–24 months and any special meeting minutes related to structural or financial matters.

  2. What is the maintenance plan for roofs, waterproofing, balconies, and other structural elements? Provide maintenance logs.

Practical and transactional

  1. Will the association consider escrow holdbacks or completion of critical repairs before closing?

  2. Are there lender or insurer restrictions currently impacting mortgage availability or pricing for this building?

Contract protections to consider

  • Longer inspection periods: Older or coastal buildings may warrant more time for document review and engineering opinions.
  • Independent engineer review: Make your offer contingent on a satisfactory review of milestone or structural reports by your chosen engineer.
  • Escrow holdback: If repairs are identified, negotiate an escrow funded at closing to ensure work is completed by a set date with a qualified contractor.
  • Completion before closing: For immediate safety items, require completion and final inspections prior to closing.
  • Insurance and lender conditions: Confirm policy renewals and any lender or insurer requirements that could affect your loan or closing timeline.

Consult an experienced real estate attorney for contract language and options specific to your situation.

Who to hire and when

  • Licensed structural engineer: For an independent read of milestone or SIRS findings, targeted site review, or cost sanity checks.
  • Condominium real estate attorney: To interpret disclosures, statutes, and remedies if material issues surface.
  • CPA or HOA-experienced financial advisor: To evaluate reserve adequacy and funding strategies.

Quick local checks

  • Florida Statutes, Chapter 718: Review current obligations for budgets, reserves, and disclosures.
  • Florida DBPR and the Division of Condominiums: Review guidance and FAQs on milestone inspections and condo disclosures.
  • Pinellas County Building Services and City of Clearwater Building Department: Check permitting history, inspection records, and any building-safety orders.
  • Florida Building Code: Confirm permits and required standards for structural repairs.
  • Pinellas County Property Appraiser and County Clerk: Pull recorded documents, amendments, and check for liens or recorded assessments.

Final take

In Clearwater, smart condo buying means reading between the lines of budgets and inspection reports. A strong building with realistic reserves is worth more than shiny lobby finishes. If reports show immediate repairs with no plan or funding, protect your interests before you move forward.

Two quick checks to make on every deal:

  • Compare actual reserves to the reserve study’s recommended schedule. Low ratios plus upcoming projects usually signal higher assessment risk.
  • Confirm that any immediate safety findings have a clear, funded plan. Look for contracts, permits, and timelines, not promises.

Have questions on a specific Clearwater building or need help gathering documents and referrals to trusted pros? Reach out to The Link Property Group. We will guide you through a clean, confident purchase.

FAQs

What is a Florida condo milestone inspection?

  • A milestone inspection is a structural evaluation by a licensed engineer or architect that identifies deficiencies, prioritizes repairs, and outlines safety and timing recommendations as buildings age.

How do Clearwater condo reserves affect my risk of assessments?

  • Low reserve balances relative to the reserve study’s recommendations increase the chance of special assessments, especially for near-term projects like roofs or balcony repairs.

What does a low reserve funding ratio mean for buyers?

  • A low ratio means the association holds less cash than recommended for replacements, which can signal deferred maintenance and future assessments or borrowing.

Can a Florida condo association vote to waive reserves?

  • Many associations can vote to reduce or waive certain reserve funding, which should be disclosed in minutes or budgets and is a key red flag to review before buying.

What should I do if a report shows immediate safety concerns?

  • Request the funding plan, contractor bids, and permits, and consider making your purchase contingent on completion of critical repairs or an escrow holdback at closing.

Ready to Make a Move?

Whether you're buying, selling, or relocating, The Link Property Group is here to guide you every step of the way in Florida or Texas. Reach out today for personalized, expert advice and a seamless real estate experience.